Portfolio

  • Akzo Nobel Rapid Supply Unit Process

    Akzo Nobel needed to add a “Rapid Supply Unit” (RSU) process. The RSU process will replicate the plant’s complete coatings process on a smaller ...

    Read More
  • Dollar General Data Center Expansion & Redundancy

    With Dollar General’s high growth rate, they needed to expand their data center and also wanted to enhance the reliability of the data center’s el...

    Read More
  • ESC Lab Sciences Building 1

    Due to aging infrastructure and increased growth, ESC Lab Sciences needed to renovate and expand one of their laboratory buildings to meet current and...

    Read More
  • TN Army National Guard Network Operations Center

    With the increased critical and sensitive nature of the operations at the Tennessee Army National Guard’s Network Operations Center, they were in ne...

    Read More
  • Akzo Nobel Electrical Service Upgrades

    For improved electrical service reliability and protection of process equipment, Akzo Nobel needed to replace the Plant’s primary electrical service...

    Read More
  • State of TN Data Center Facility Modernization

    The 46,000 SF of office areas and other areas in the State’s 32-year-old, 77,500 SF Data Center Facility were renovated and modernized. This project...

    Read More
  • State of TN Data Center UPS Battery Plants

    The battery plants for the State’s parallel-redundant UPS system were in need of replacement and upgrade. Puckett Engineering provided the design, c...

    Read More
  • State of TN Data Center Redundant Generator

    In order to improve the reliability of one of the State’s data centers, a redundant backup generator was needed. Puckett Engineering provided the de...

    Read More
  • Dollar General Corporate Data Center Study

    With Dollar General’s high growth rate they needed to expand their corporate data center. In addition they needed to enhance the reliability of the ...

    Read More
  • Vine Hill Towers High-Rise Renovation

    Puckett Engineering was selected to provide electrical design and construction admin services for the renovation and upgrade of a ten story, 147 unit,...

    Read More
  • Shelby Park

    As Phase One of the Shelby Park master plan improvements, Puckett Engineering was selected to provide lighting design and engineering services for ill...

    Read More
  • The Sound Kitchen

    The Sound Kitchen needed to expand their existing recording studio facility to add additional control rooms, studio, isolation booths, lounge, offices...

    Read More
  • Integrity Music

    Integrity Music needed to add an editing suite to their existing recording studio in Mobile, Alabama and at the same time wanted to “clean-up” som...

    Read More
  • Silvercreek Recording Studio

    An existing recording studio needed to be completely renovated and expanded into a state of the art recording studio with new control room, studio, is...

    Read More
  • State of TN Data Center Reliability Improvements

    The State needed to improve the reliability of their data center’s power distribution to avoid single-point failures. Puckett Engineering was retain...

    Read More
  • Cleveland Regional Jetport

    Due to increased demand and growth for aviation services in the Cleveland, TN area, the city needed to build a larger airport and one that could accom...

    Read More
  • Airfield Lighting Replacement and Upgrade for Union Springs Airport

    Puckett Engineering designed the replacement and upgrade of the airfield lighting for Union Springs Airport. The project included a comprehensive upgr...

    Read More
  • Hopkinsville Electric Network Operations Center

    After a lightning strike damaged equipment at Hopkinsville Electric System’s Network Operating Center (NOC), Puckett Engineering studied the NOC...

    Read More
  • Dollar General Corporate Data Center Major Upgrade

    Dollar General, a Fortune 200 company headquartered in Goodlettsville, TN, needed to expand their corporate data center’s critical infrastructure an...

    Read More
  • Airport Lighting Improvements for Gatlinburg-Pigeon Forge Airport

    Following the airport’s relocation to a new terminal building, the airport needed to relocate the airfield lighting Constant Current Regulators (CCR...

    Read More
  • IP-Based Video Surveillance System for Madison Middle School

    To enhance security measures at Madison Middle School, Puckett Engineering designed an IP-based video surveillance system that included 32 IP video ca...

    Read More
  • Power System Studies

    To help its clients avoid inadvertent shutdown of critical equipment due to unrelated faults and to comply with OSHA regulations for arc-flash hazards...

    Read More
  • Video Surveillance Systems for Metro Nashville Public Schools

    Puckett Engineering designed and commissioned closed-circuit television (CCTV) surveillance systems for Metro Nashville schools from 2002 to 2010. The...

    Read More
  • Metro Nashville Emergency Communications Center P25 Radio Upgrades

    Metro’s ECC needed to upgrade their radio systems to meet the APCO Project 25 (P25) digital radio standards. P25’s goal is to enhance publ...

    Read More

Comments are closed.