  • Lake Cumberland Regional Airport

    Project included design and construction admin services for complete upgrade of the airfield lighting 5,801-foot runway and full-length taxiway. The p...

    Read More
  • Dollar General UPS Replacement and Consolidation

    Following an initial study, Puckett Engineering provided design for replacing two B-side UPS systems with one larger UPS system for Dollar General’s...

    Read More
  • Tucker-Guthrie (Harlan) Airport Fuel Farm

    The airport was in need of replacing aged fuel tanks and dispensers for Jet-A and Avgas with modern fuel storage and dispensing systems. Puckett Engin...

    Read More
  • Tullahoma Municipal Airport Signage & Taxiway F

    Puckett Engineering designed runway and taxiway signage for an extensive network of runways and taxiways at the Tullahoma Municipal Airport.  The air...

    Read More
  • Tullahoma Municipal Airport ODALS

    Puckett Engineering was selected to provide electrical design services for the installation of a new ODAL system at the end of runway 6-24 at Tullahom...

    Read More
  • Maury County Regional Airport

    The Maury County Regional Airport needed to relocate their existing parallel taxiway to allow for larger aircraft to use the airport. In addition, the...

    Read More
  • Metro-Nashville Emergency Communications Center

    Puckett Engineering is pleased to be serving as the prime consultant for major electrical infrastructure upgrades to the Metro ECC. Construction is we...

    Read More
  • Network Services Group Colocation Data Center Expansion

    Following a study for expanding NSG’s data center, Puckett Engineering provided design for adding an additional UPS system for doubling the data cen...

    Read More
  • Dollar General UPS Study

    One of the B-side UPS systems for Dollar General’s data center was nearing the end of its useful life and needed to be replaced. At the same time, t...

    Read More
  • Dollar General Data Center Expansion & Redundancy

    With Dollar General’s high growth rate, they needed to expand their data center and also wanted to enhance the reliability of the data center’s el...

    Read More
  • Dollar General Corporate Data Center Major Upgrade

    Dollar General, a Fortune 200 company headquartered in Goodlettsville, TN, needed to expand their corporate data center’s critical infrastructure an...

    Read More
  • Dollar General Corporate Data Center Study

    With Dollar General’s high growth rate they needed to expand their corporate data center. In addition they needed to enhance the reliability of the ...

    Read More
  • Network Services Group Colocation Data Center Study

    After deciding to expand their data center, NSG brought in Puckett Engineering to determine the additional I.T. load that could be added to both sides...

    Read More
  • Vintage Baker’s Crossing Site Lighting

    A joint venture project between Summerlin Development and TDK Construction, this 252 luxury apartment development is set to be built in the highly des...

    Read More
  • Integrated Solar PV System

    Puckett Engineering engineered the power distribution for a design/build solar project (Integrated Solar provided installation) to deliver 42kW of AC ...

    Read More
  • Lebanon Municipal Airport

    Due to the need for onsite storage and dispensing of Jet-A fuel, the Lebanon Municipal airport needed to add a Jet-A fuel storage tank and dispensing ...

    Read More
  • Akzo Nobel Rapid Supply Unit Process

    Akzo Nobel needed to add a “Rapid Supply Unit” (RSU) process. The RSU process will replicate the plant’s complete coatings process on a smaller ...

    Read More
  • ESC Lab Sciences Building 1

    Due to aging infrastructure and increased growth, ESC Lab Sciences needed to renovate and expand one of their laboratory buildings to meet current and...

    Read More
  • TN Army National Guard Network Operations Center

    With the increased critical and sensitive nature of the operations at the Tennessee Army National Guard’s Network Operations Center, they were in ne...

    Read More
  • Akzo Nobel Electrical Service Upgrades

    For improved electrical service reliability and protection of process equipment, Akzo Nobel needed to replace the Plant’s primary electrical service...

    Read More
  • State of TN Data Center Facility Modernization

    The 46,000 SF of office areas and other areas in the State’s 32-year-old, 77,500 SF Data Center Facility were renovated and modernized. This project...

    Read More
  • State of TN Data Center UPS Battery Plants

    The battery plants for the State’s parallel-redundant UPS system were in need of replacement and upgrade. Puckett Engineering provided the design, c...

    Read More
  • State of TN Data Center Redundant Generator

    In order to improve the reliability of one of the State’s data centers, a redundant backup generator was needed. Puckett Engineering provided the de...

    Read More
  • Vine Hill Towers High-Rise Renovation

    Puckett Engineering was selected to provide electrical design and construction admin services for the renovation and upgrade of a ten story, 147 unit,...

    Read More