Commissioning

Apr 17, 2017 | Post by: admin Comments Off on Dollar General Data Center Expansion & Redundancy

Dollar General Data Center Expansion & Redundancy

With Dollar General’s high growth rate, they needed to expand their data center and also wanted to enhance the reliability of the data center’s electrical and mechanical infrastructure systems. Puckett Engineering was retained as the prime consultant to design solutions for expanding the data center and reconfiguring the electrical and

Read More
Apr 17, 2017 | Post by: admin Comments Off on ESC Lab Sciences Building 1

ESC Lab Sciences Building 1

Due to aging infrastructure and increased growth, ESC Lab Sciences needed to renovate and expand one of their laboratory buildings to meet current and future needs. With the critical nature of some of the lab processes, having a reliable electrical infrastructure system was an important goal of ESC, including a

Read More
Jun 22, 2015 | Post by: admin Comments Off on State of TN Data Center UPS Battery Plants

State of TN Data Center UPS Battery Plants

The battery plants for the State’s parallel-redundant UPS system were in need of replacement and upgrade. Puckett Engineering provided the design, construction admin, and commissioning. Puckett Engineering’s solutions began with an assessment of the existing layout and configuration of the two existing 675 kW UPS battery plants and the DC

Read More
Jun 12, 2015 | Post by: admin Comments Off on State of TN Data Center Redundant Generator

State of TN Data Center Redundant Generator

In order to improve the reliability of one of the State’s data centers, a redundant backup generator was needed. Puckett Engineering provided the design, construction admin, and commissioning. Puckett Engineering’s solutions began with an assessment of the existing emergency power system to determine the best way to incorporate a redundant

Read More
Feb 18, 2012 | Post by: brent Comments Off on Dollar General Corporate Data Center Major Upgrade

Dollar General Corporate Data Center Major Upgrade

Dollar General, a Fortune 200 company headquartered in Goodlettsville, TN, needed to expand their corporate data center’s critical infrastructure and improve its reliability. Puckett Engineering evaluated the feasibility and cost to expand the data center’s emergency power and UPS systems. The study also included a detailed evaluation of using a

Read More
Jan 18, 2012 | Post by: brent Comments Off on IP-Based Video Surveillance System for Madison Middle School

IP-Based Video Surveillance System for Madison Middle School

To enhance security measures at Madison Middle School, Puckett Engineering designed an IP-based video surveillance system that included 32 IP video cameras at various locations inside and outside of the building. The IP-based system offered several advantages over an analog system, including web access and digital recording. Camera positions were

Read More
Jan 08, 2012 | Post by: admin Comments Off on Video Surveillance Systems for Metro Nashville Public Schools

Video Surveillance Systems for Metro Nashville Public Schools

Puckett Engineering designed and commissioned closed-circuit television (CCTV) surveillance systems for Metro Nashville schools from 2002 to 2010. The projects included new CCTV systems and modifications to existing systems. The CCTV systems included digital video recording systems, monitors, connection to local area networks, indoor and outdoor cameras, lightning/surge protection, and

Read More
Dec 22, 2011 | Post by: admin Comments Off on Metro Nashville Emergency Communications Center P25 Radio Upgrades

Metro Nashville Emergency Communications Center P25 Radio Upgrades

Metro’s ECC needed to upgrade their radio systems to meet the APCO Project 25 (P25) digital radio standards. P25’s goal is to enhance public safety responders’ capabilities to communicate with each other and achieve timely response. Puckett Engineering was retained to ensure the critical infrastructure could support the new systems. This

Read More
Dec 22, 2011 | Post by: admin Comments Off on Metro Nashville Emergency Communications Center Upgrade

Metro Nashville Emergency Communications Center Upgrade

Metro Nashville needed enhanced reliability for the city’s command center for emergency communications. Puckett Engineering, which had previously performed a study for a 2N redundancy upgrade, was retained as a technical consultant for implementing the upgrades using a fast-track design/build RFP process. The upgrades included a 225 kVA UPS system

Read More
Dec 17, 2011 | Post by: brent Comments Off on Stadium Lighting for Metro Nashville Public Schools

Stadium Lighting for Metro Nashville Public Schools

Due to poor field illumination and inefficiencies at 10 Metro Nashville high school athletic fields, MNPS retained Puckett Engineering to provide professional services to replace field lighting systems, including new poles, fixtures, power distribution, and controls. A primary objective was adequate and comfortable illumination levels without excessive glare for players

Read More