With Dollar General’s high growth rate they needed to expand their corporate data center. In addition they needed to enhance the reliability of the electrical and mechanical infrastructure systems that support the data center’s operations. Puckett Engineering was retained to evaluate the existing conditions with respect to capacity and reliability
Read More
Engineering Studies

Dollar General Corporate Data Center Study

Hopkinsville Electric Network Operations Center
After a lightning strike damaged equipment at Hopkinsville Electric System’s Network Operating Center (NOC), Puckett Engineering studied the NOC’s electrical system to determine why the damage happened and how to prevent future damage. Puckett Engineering evaluated the Center’s emergency generator system, UPS system, grounding, surge protection, and other systems. The
Read More
Read More

Dollar General Corporate Data Center Major Upgrade
Dollar General, a Fortune 200 company headquartered in Goodlettsville, TN, needed to expand their corporate data center’s critical infrastructure and improve its reliability. Puckett Engineering evaluated the feasibility and cost to expand the data center’s emergency power and UPS systems. The study also included a detailed evaluation of using a
Read More
Read More

Power System Studies
To help its clients avoid inadvertent shutdown of critical equipment due to unrelated faults and to comply with OSHA regulations for arc-flash hazards, Puckett Engineering performs Power System Studies. These studies begin with a Fault Analysis for calculating short-circuit currents. Next, a Coordination Study determines if downstream circuit breakers and fuses
Read More
Read More

Metro Nashville Emergency Communications Center P25 Radio Upgrades
Metro’s ECC needed to upgrade their radio systems to meet the APCO Project 25 (P25) digital radio standards. P25’s goal is to enhance public safety responders’ capabilities to communicate with each other and achieve timely response. Puckett Engineering was retained to ensure the critical infrastructure could support the new systems. This
Read More
Read More

Metro Nashville Emergency Communications Center Upgrade
Metro Nashville needed enhanced reliability for the city’s command center for emergency communications. Puckett Engineering, which had previously performed a study for a 2N redundancy upgrade, was retained as a technical consultant for implementing the upgrades using a fast-track design/build RFP process. The upgrades included a 225 kVA UPS system
Read More
Read More

Metro Nashville Public Schools Primary Data Center UPS A/C Expansion
Puckett Engineering provided the design for additional air conditioning capacity for the UPS and MDF rooms at the Primary Data Center for Metro Nashville’s school system. At Metro’s request, Puckett Engineering compared precision computer room A/C versus comfort-type A/C systems. Based on the cost-benefit, Metro selected comfort type A/C. PE
Read More
Read More

Critical Upgrades for Metro Nashville Public Schools Primary Data Center
Due to MNPS’ emphasis on providing the latest IT tools to its administrators, teachers, and students, Puckett Engineering was chosen to study, plan and design the expansion of the data center’s critical mechanical and electrical infrastructure to accommodate anticipated growth. Under the first of two contracts, Puckett Engineering upgraded the
Read More
Read More
Dec 12, 2011 | Post by: admin Comments Off on Lightning Study and Protection for Gladeville Baptist Church
Lightning Study and Protection for Gladeville Baptist Church
Gladeville Baptist Church in Gladeville, TN, was experiencing costly lightning-strike damage, especially to the Direct Digital Control (DDC) system for the 90,000-SF building’s 49 HVAC units. Puckett Engineering performed a lightning study and designed preventative solutions for the church, which consisted of three adjoining structures built between 1956 and 2008.
Read More
Read More