Facility Design

Dec 03, 2011 | Post by: brent Comments Off on Metro Nashville ECC Data Center Relocation and Space Reuse

Metro Nashville ECC Data Center Relocation and Space Reuse

Due to IT equipment becoming more compact and therefore requiring a smaller footprint, Metro Nashville decided to relocate the Emergency Communication Center’s data center equipment to the radio room and convert the data center into office space for IT personnel. This required a multi-phase project for first relocating the data center

Read More
Dec 02, 2011 | Post by: brent Comments Off on Metro Nashville Emergency Communications Center Dispatch Station Upgrades

Metro Nashville Emergency Communications Center Dispatch Station Upgrades

Metro Nashville’s Emergency Communications Center needed redesigned E-911 call-taker and dispatcher workstations to improve emergency response. Puckett Engineering provided electrical infrastructure design to replace 18 call-taker stations, 12 dispatch stations, and 8 training call-taker/dispatch stations. Infrastructure included circuits from the central UPS systems for the computer, telephone, and radio equipment

Read More
Dec 01, 2011 | Post by: brent Comments Off on Metro Nashville Emergency Operations Center Upgrade

Metro Nashville Emergency Operations Center Upgrade

To improve interdepartmental communication and emergency response, Metro Nashville retained Puckett Engineering to upgrade its Emergency Operations Center’s electrical infrastructure, including new lighting, new critical circuits from the redundant UPS system, replacement of all wiring, coordination of the electrical requirements for the modular furniture with the interior designer for supplying the

Read More