Mission Critical

Jul 27, 2021 | Post by: admin Comments Off on Dollar General UPS Replacement and Consolidation

Dollar General UPS Replacement and Consolidation

Following an initial study, Puckett Engineering provided design for replacing two B-side UPS systems with one larger UPS system for Dollar General’s data center. This included a 425kW/kVA UPS with lithium-ion battery, Maintenance Bypass Cabinet with load-bank connection, a fire-rated UPS room with floor structural reinforcement, computer room type A/C

Read More
Jul 27, 2021 | Post by: admin Comments Off on Network Services Group Colocation Data Center Expansion

Network Services Group Colocation Data Center Expansion

Following a study for expanding NSG’s data center, Puckett Engineering provided design for adding an additional UPS system for doubling the data center’s UPS capacity and to provide 2N redundancy for a portion of the I.T. racks.  The project also included adding metered panelboards for supplying racks, power and controls

Read More
Jul 27, 2021 | Post by: admin Comments Off on Dollar General UPS Study

Dollar General UPS Study

One of the B-side UPS systems for Dollar General’s data center was nearing the end of its useful life and needed to be replaced. At the same time, the owner wanted to relocate the UPS to a dedicated UPS room. Puckett Engineering provided a study to determine location for UPS

Read More
Apr 17, 2017 | Post by: admin Comments Off on Dollar General Data Center Expansion & Redundancy

Dollar General Data Center Expansion & Redundancy

With Dollar General’s high growth rate, they needed to expand their data center and also wanted to enhance the reliability of the data center’s electrical and mechanical infrastructure systems. Puckett Engineering was retained as the prime consultant to design solutions for expanding the data center and reconfiguring the electrical and

Read More
Jul 27, 2021 | Post by: brent Comments Off on Dollar General Corporate Data Center Major Upgrade

Dollar General Corporate Data Center Major Upgrade

Dollar General, a Fortune 200 company headquartered in Goodlettsville, TN, needed to expand their corporate data center’s critical infrastructure and improve its reliability. Puckett Engineering evaluated the feasibility and cost to expand the data center’s emergency power and UPS systems. The study also included a detailed evaluation of using a

Read More
Jun 11, 2015 | Post by: admin Comments Off on Dollar General Corporate Data Center Study

Dollar General Corporate Data Center Study

With Dollar General’s high growth rate they needed to expand their corporate data center. In addition they needed to enhance the reliability of the electrical and mechanical infrastructure systems that support the data center’s operations. Puckett Engineering was retained to evaluate the existing conditions with respect to capacity and reliability

Read More
Jul 27, 2021 | Post by: admin Comments Off on Network Services Group Colocation Data Center Study

Network Services Group Colocation Data Center Study

After deciding to expand their data center, NSG brought in Puckett Engineering to determine the additional I.T. load that could be added to both sides of the data center and the size required for adding an additional UPS system. A portion of the racks required redundant power and a portion

Read More
Apr 17, 2017 | Post by: admin Comments Off on ESC Lab Sciences Building 1

ESC Lab Sciences Building 1

Due to aging infrastructure and increased growth, ESC Lab Sciences needed to renovate and expand one of their laboratory buildings to meet current and future needs. With the critical nature of some of the lab processes, having a reliable electrical infrastructure system was an important goal of ESC, including a

Read More
Jun 22, 2015 | Post by: admin Comments Off on State of TN Data Center UPS Battery Plants

State of TN Data Center UPS Battery Plants

The battery plants for the State’s parallel-redundant UPS system were in need of replacement and upgrade. Puckett Engineering provided the design, construction admin, and commissioning. Puckett Engineering’s solutions began with an assessment of the existing layout and configuration of the two existing 675 kW UPS battery plants and the DC

Read More
Jun 12, 2015 | Post by: admin Comments Off on State of TN Data Center Redundant Generator

State of TN Data Center Redundant Generator

In order to improve the reliability of one of the State’s data centers, a redundant backup generator was needed. Puckett Engineering provided the design, construction admin, and commissioning. Puckett Engineering’s solutions began with an assessment of the existing emergency power system to determine the best way to incorporate a redundant

Read More