Puckett Engineering » Dollar General Corporate Data Center

Dollar General, a Fortune 200 company headquartered in Goodlettsville, TN, needed to expand their corporate data center’s critical infrastructure and improve its reliability. Puckett Engineering evaluated the feasibility and cost to expand the data center’s emergency power and UPS systems. The study also included a detailed evaluation of using a 2N redundant electrical system. Puckett Engineering then designed and oversaw the implementation of the following improvements: Doubled emergency power capacity, expanded UPS capacity, provided redundant power to loads, provisions for future computer room A/C units to maintain N+1 redundancy, reduced harmonics, and preaction sprinkler systems. PDF Case Study.

Dollar General Corporate Data Center

puckett engineering

CONTACT US

Puckett Engineering, PLLC
533 Myatt Drive
Nashville, TN 37115
Phone: (615) 815-1390
Email: info@puckettengineering.com

https://puckettengineering.com/wp-content/uploads/2022/03/cropped-Footer-Logo.png
error: Content is protected !!
Scroll to Top