Due to aging infrastructure and increased growth, ESC Lab Sciences needed to renovate and expand one of their laboratory buildings to meet current and future needs. With the critical nature of some of the lab processes, having a reliable electrical infrastructure system was an important goal of ESC, including a backup emergency generator and UPS system. Energy efficient and comfortable lighting was also an important goal. A creative lighting solution was developed to work with the existing low structure to “open up” the space. With the electrical systems being the most involved part of the project, Puckett Engineering took on the role of lead designer, coordinating the project with the Owner and other design consultants. PDF Case Study.
ESC Lab Sciences Building 1

CONTACT US
Puckett Engineering, PLLC
533 Myatt Drive
Nashville, TN 37115
Phone: (615) 815-1390
Email: info@puckettengineering.com
