Puckett Engineering » Lake Cumberland Regional Airport

The project included design and construction admin services for the complete upgrade of the airfield lighting 5,801-foot runway and full-length taxiway. The project included the replacement of runway and taxiway edge lighting and signage with LED lighting, replacement of REILs with LED REILs, and replacement of PAPIs. To protect lighting from lightning damage, lightning arrestors were installed along with the airfield lighting 5kV circuits, in addition to counterpoise grounding. the beacon and tower were replaced with a high-intensity beacon and a 70-foot tower with a motorized winch. A vault building with lightning protection was provided for housing the airfield lighting regulators and electrical panels. Backup power was provided for airfield lighting from an existing generator. Airfield lighting was controlled via a lighting control panel and radio controller.

Lake Cumberland Regional Airport

puckett engineering

CONTACT US

Puckett Engineering, PLLC
533 Myatt Drive
Nashville, TN 37115
Phone: (615) 815-1390
Email: info@puckettengineering.com

https://puckettengineering.com/wp-content/uploads/2022/03/cropped-Footer-Logo.png
error: Content is protected !!
Scroll to Top