Puckett Engineering is highly experienced and passionate about performing studies, designing, and commissioning facility infrastructure systems for mission-critical applications. For the electrical systems, this includes supplying and protecting sensitive critical equipment from malfunctions and damage caused by power interruptions, lightning, voltage transients, harmonics, voltage imbalance, magnetic fields, improper grounding, etc. This may involve redundant, fault-tolerant power distribution systems, standby generators, UPS systems, static transfer switches, lightning surge protection, monitoring systems, and other solutions. For mechanical systems, this includes providing high precision and redundant air conditioning for maintaining an acceptable environment for equipment and personnel 24/7 and fire protection systems, including dry-pipe, preaction sprinkler systems, and/or clean-agent fire suppression systems. These services apply to most facilities but especially data centers, E-911 centers, call centers, laboratories, recording studios, broadcast facilities, telecommunications, and industrial processes. Through their collaborative team, these services are also provided for other parts of the facility infrastructure. We aim to completely understand the client’s systems, processes, and goals to effectively apply the best solutions. Contact us for mission-critical engineering in Nashville, TN, and other areas.

Hopkinsville Electric Network Operations

Hopkinsville Electric Network Operations

After a lightning strike caused damage to equipment at Hopkinsville Electric System’s Network Operating Center (NOC), Puckett Engineering studied the NOC’s electrical system to determine why the damage happened and …

Hopkinsville Electric Network Operations Read Article

Gladeville Baptist Church Lightning Study

Gladeville Baptist Church Lightning Study

Gladeville Baptist Church in Gladeville, TN, was experiencing costly lightning-strike damage, especially to the Direct Digital Control (DDC) system for the 90,000-SF building’s 49 HVAC units. Puckett Engineering performed a …

Gladeville Baptist Church Lightning Study Read Article

Dollar General UPS Study

Dollar General UPS Study

One of the B-side Universal Power Systems for Dollar General’s data center was nearing the end of its useful life and needed to be replaced. The owner wanted to relocate …

Dollar General UPS Study Read Article

Dollar General Corporate Data Center Study

Dollar General Corporate Data Center Study

With Dollar General’s high growth rate they needed to expand their corporate data center. In addition they needed to enhance the reliability of the electrical and mechanical infrastructure systems that …

Dollar General Corporate Data Center Study Read Article

puckett engineering

CONTACT US

Puckett Engineering, PLLC
533 Myatt Drive
Nashville, TN 37115
Phone: (615) 815-1390
Email: info@puckettengineering.com

https://puckettengineering.com/wp-content/uploads/2022/03/cropped-Footer-Logo.png
error: Content is protected !!
Scroll to Top