Puckett Engineering was selected to provide electrical design services for the installation of a new ODAL system at the end of runway 6-24 at Tullahoma Municipal Airport. This work included replacing the existing REILs to work with the ODAL system, providing power for the ODAL system, a dedicated constant current regulator, and controls for the ODAL system so it is operational when the runway lighting is operational. Airfield 5kV cables were installed in underground conduit in addition to being protected from lightning by a counterpoise grounding system.
Tullahoma Municipal Airport ODALS

CONTACT US
Puckett Engineering, PLLC
533 Myatt Drive
Nashville, TN 37115
Phone: (615) 815-1390
Email: info@puckettengineering.com